Skip to main content
Loading…
This section is included in your selections.

In addition to other requirements, improvements shall conform to the requirements of this title and improvement standards or specifications adopted by the city and shall be installed in accordance with the following procedures:

(1) Work shall not be commenced until plans have been reviewed for adequacy and approved by the city engineer. To the extent necessary for evaluation of the subdivision or partition proposal, the plans may be required before approval of the final map. All plans shall be prepared on material that is suitable for binding and copying purposes, and that has such characteristics of strength and permanency in accordance with the requirements of the city.

(2) Work shall not be commenced until the city engineer has been notified in advance, and if work has been discontinued for any reason it shall not be resumed until the city engineer has been notified.

(3) Required improvements shall be inspected by and constructed to the satisfaction of the city engineer. The city engineer may require changes in typical sections and details if unusual conditions arising during construction warrant such change in the public interest.

(4) Underground utilities, sanitary sewers, and storm drains installed in streets by the subdivider or partitioner shall be constructed prior to the surfacing of the streets.

(5) Stubs for service connections for underground utilities and sanitary sewers shall be placed to lengths that will obviate the necessity for disturbing street improvements when service connections are made.

(6) A map showing public improvements as built shall be filed with the city engineer upon completion of the improvements. (Ord. 1947 § 1, 2005; Ord. 1758 § 7, 1990; Ord. 1175 § 28, 1961)