Skip to main content
Loading…
This section is included in your selections.

Construction of new critical facilities shall be, to the extent possible, located outside the limits of the special flood hazard area. Construction of new critical facilities shall be permissible if no feasible alternative site is available. New essential facilities and special occupancy structures to be located in the special flood hazard area shall comply with ORS 455.446 and 455.447 and this chapter and title. (Ord. 2027 § 1, 2018)